Project

Muni Forward 5 Fulton Rapid Proposal

Introduksyon sa Proyekto (Project Introduction)

As part of Muni Forward, SFMTA has identified the 5 Fulton corridor as being a part of its proposed Rapid Network. In most cities, a Rapid Network is bus service with dedicated lanes and vehicles that allows transit to move swiftly on the street. With our Rapid Network, we intend to build transit priority lanes with efficient stop spacing to move buses quickly along their routes. We’ll also create better boarding zones to make it safer and faster for passengers to get on board, and make it easier to find our bus stops and shelters with improved signage.

The 5 Fulton route carries about 19,000 daily customers on an average weekday. The route’s study corridor is 5.6 miles long and includes Fulton Street between La Playa and Central Avenue, Central Avenue between Fulton and McAllister streets, and McAllister Street between Central Avenue and Market Street. Within the study area, the 5 Fulton operates at an average speed of 9.7 miles per hour during peak periods.  In order to reduce transit travel times and improve reliability within its proposed Rapid Network, the SFMTA proposes a toolkit of measures within the study area.

5 Fulton Rapid Proposal Overview

5 Fulton Rapid Proposal

What's Included in the 5 Fulton Rapid Proposal?

To reduce travel times and enhance reliability on the routes that make up its proposed Rapid Network, Muni Forward has identified a variety of Travel Time Reduction Proposals (TTRPs), which are engineering strategies oriented to specifically address the delays vehicles face along rapid routes. As a part of the proposed Rapid Network, the 5 Fulton has its own toolkit of TTRPs, which specifically target the evaluated causes of delays within the 5 Fulton corridor. The proposal includes:

  • Increasing bus stop spacing from 1.5 blocks to two blocks east of Arguello Boulevard and from two blocks to three blocks in the Richmond District. Currently, the 5 Fulton stops about every 1.5 blocks between Market Street and Arguello Boulevard and about every two blocks in the Richmond District. This proposal moves toward a two-block spacing between Market Street and Arguello Boulevard where blocks are longer and toward a three-block spacing in the Richmond District where blocks are shorter. By stopping fewer times, the bus would take less time to move through the corridor.
  • Optimizing bus stop locations at 12 intersections. Relocating bus stops from the near-side to the far-side of intersections would allow buses to take advantage of planned transit signal priority improvements that could allow traffic signals to be programmed to hold green lights for approaching buses. Where the 5 Fulton turns at the STOP-controlled intersection of Central Avenue and McAllister Street, this proposal would relocate the bus stops to the near-side of the intersection, eliminating the need for buses to stop once for the STOP sign and again to pick-up and drop-off customers.
  • Adding transit bulbs at 16 intersections. Transit bulbs are sidewalk extensions alongside bus stops that allow buses to pick-up and drop-off customers and reduce delay by preventing the bus from having to pull out of the travel lane into a bus stop and then wait for a gap to merge back into traffic. Transit bulbs enhance the ability of buses to take advantage of all-door boarding and provide space for transit shelters and other customer amenities.
  • Replacing all-way STOP-controlled intersections with traffic signals or traffic calming measures at nine intersections. Currently, the 5 Fulton is delayed by having to stop at multiple intersections with STOP signs. Some STOP signs could be replaced with traffic signals that could be programmed to hold green lights for approaching buses. At some intersections along McAllister Street, traffic calming measures could replace STOP signs and eliminate the need for buses to come to a complete stop while maintaining pedestrian safety. Potential traffic calming measures include traffic circles or sidewalk extensions.
  • Adding right-turn pockets at 4 intersections. Right-turn pockets would reduce Muni delays associated with buses waiting behind right-turning motorists by providing a dedicated space for turning vehicles to queue.
  • Implementing a road diet on Fulton Street between Stanyan Street and Central Avenue. Within this six block segment of Fulton Street, the travel lanes are too narrow to allow large vehicles such as buses to travel alongside other vehicles moving in the same direction. By removing one travel lane in each direction and widening the remaining travel lanes, delays would potentially be reduced.
  • Adding peak-period parking restriction along east side of Central Avenue between Fulton and McAllister streets. Parking and loading along this block of Central Avenue delay Muni vehicles and make it difficult for buses traveling in opposite directions to pass each other. Restricting parking on the east side of Central Avenue during peak periods would provide more space for buses to maneuver and would reduce Muni delays.
  • Adding pedestrian bulbs or islands at 3 intersections. Two treatments are being considered to shorten crossing distances and improve pedestrian safety. Pedestrian bulbs are sidewalk extensions at intersection corners that improve pedestrian safety by reducing the roadway crossing distance, making pedestrians waiting to cross the street more visible to approaching motorists, and reducing the speed of motorists turning from cross streets. Pedestrian islands provide a raised refuge area in the middle of the street for crossing pedestrians.
Together, the proposed changes are anticipated to reduce the travel time of the 5 Fulton by about six minutes in each direction (12 minutes total) within the study area (18 percent reduction), improving the average operating speed to 11.7 miles per hour and improving service reliability. Transit signal priority improvements are anticipated to save an additional 1.5 minutes in each direction. Other changes such as operational improvements and network enhancements would further improve travel times along the corridor and add valuable customer amenities such as NextBus displays. The travel time savings would also reduce operating costs on the line and allow for service to be cost effectively increased.
 

Fast Tracked Segment

Note that approval and implementation of the following segment of this Rapid Proposal is being fast-tracked:
  • Fulton Street between 46th and 25th Avenues
Specifically, this segment is proposed for fast-tracking for the purpose of coordinating with an already-scheduled repaving project, which is anticipated for initiation between the Spring and Fall of 2014.
 

Related Projects

  • Approved 5-Fulton Service Adjustments
    • On March 28, 2014, the SFMTA Board of Directors approved and legislated many of Muni Forward's proposed service and route changes, including service adjustments for the 5-Fulton. These adjustments include route restructuring, frequency improvements, and vehicle type changes, which will direct resources where they are needed most, reducing crowding and improving connections to regional transit.
  • 5-Fulton Rapid Service
    • View current Rapid Service for the 5-Fulton
Project update

2022 Muni Serbisyo Network

Ano ang dapat maging itsura ng Muni service sa 2022? Sa nakalipas na mga buwan, nagbahagi kami ng tatlong alternatibo para sa kung paano madaragdagan ang serbisyo sa unang bahagi ng 2022. Nakatanggap...

Project update

Naaprubahan 2022 Muni Service Network Plan

Sa taglagas ng 2021, nagtanong kami sa mga taga-San Francisco kung ano ang dapat naming pagtuunan ng pansin kung kami ay makapagdadagdag ng Muni service sa unang bahagi ng 2022. Nakatanggap kami ng...

Project update

Alamin kung paano binabalanse ng SFMTA ang badyet nito!

Nais namin kayong marinig. Ang San Francisco Municipal Transportation Agency ay magsasagawa ng mga pagpupulong sa komunidad upang talakayin ang dalawang-taong badyet nito, kabilang ang mga potensyal...

Project update

Mga Detalye ng Panukala para sa 2022 Muni Service

Sa taglagas ng 2021, nagtanong kami sa mga taga-San Francisco kung ano ang dapat naming pagtuunan ng pansin kung kami ay makapagdadagdag ng Muni service sa unang bahagi ng 2022. Nakatanggap kami ng...

Page

Mga Pagdinig sa Boot

Upang Mag-iskedyul ng Boot Hearing Pagkatapos ng Immobilization Naiintindihan namin ang iyong pagkadismaya kapag bumalik ka sa iyong naka-park na sasakyan para lang malaman na ang iyong sasakyan ay...

Project

Mga Bagong Balita at Pagtugon sa COVID-19

Introduksyon sa Proyekto (Project Introduction)

Lubos naming sinusubaybayan kung ano ang nangyayari sa nover coronavirus (COVID-19). Mangyaring patulong na tingnan ang page na ito para sa mga pinakabagong update. Tingnan ang aming COVID-19 Data...

Committee

Board Secretary Search Committee

This is an archive of a past committee.

Responsibilities

The Board of Directors Search Committee for the Board Secretary was an ad hoc committee which met in 2020. The committee was chaired by Gwyneth Borden. Other members were: Cheryl Brinkman and Amanda Eaken. 

The committee’s scope of work was as follows:

  • Approve the job description for the Board Secretary
  • Interview qualified candidates and 
  • Recommend individuals to the SFMTA Board for consideration
Project

Visitacion Valley at Portola Community Based Transportation Plan

Introduksyon sa Proyekto (Project Introduction)

Ang Visitacion Valley at Portola ay mga masagana at katangi-tanging kapitbahayan sa San Francisco na nararapat sa mas mahusay na serbisyo at imprastrukturang pantransportasyon. Ang Community-Based...

Project

2022 Muni Serbisyo Network

Introduksyon sa Proyekto (Project Introduction)

Nagsusumikap kami upang muling ibalik ang mga pasahero sa pamamagitan ng pagkakaloob ng mataas na kalidad at serbisyong maaasahan ng mga tao. Upang gawing mas maaasahan ang mga iskedyul at mabawasan...

Project update

Agosto 14 Mga Pagbabago sa Serbisyo ng Muni

-

Simula Sabado, Agosto 14, ilulunsad ng SFMTA ang isa pang COVID-19 Muni Pagbabago ng Serbisyo, pagdaragdag ng maraming mga ruta ng konektor at pag-pupuno ng mga puwang sa serbisyo sa mga kapitbahayan...

Fares

Libreng Muni para sa Kabataan

Pinalawak ng SFMTA ang Libreng Muni para sa Mababang- at Katamtamang Kita na Kabataan sa lahat ng kabataan 18 taong gulang pataas, anuman ang antas ng kita ng sambahayan. Walang aplikasyon o katibayan...

Reports and documents

Engineering Public Hearing Agenda, January 14, 2022

Friday, 14 January, 2022

The Streets Division of the San Francisco Municipal Transportation Agency will hold a public hearing on Friday, January 14, 2022, at 10:00 AM. Meeting Access Instructions This hearing will be...

Project update

Fall 2022 Slow Streets Update

Kasunod ng tagumpay ng COVID Response Slow Streets Program, ang SFMTA ay nagmumungkahi ng isang patuloy na Slow Streets Program para sa San Francisco. Ang SFMTA ay magdadala ng mga detalye ng Programa...