Введение к проекту (Project Introduction)
In July 2020, the SFMTA completed a two-way bikeway connection between the Promenade/Berry St. and Terry Francois Blvd. to the south across the Lefty O’Doul (3rd St) Bridge as part of the Third Street Bridge quick-build project. The protected bikeway provides dedicated space for bicyclists and reduce the risk of conflicts with vehicles. The Third Street Bridge Bikeway Connection closes a critical gap in our bike network by connecting the existing protected two-way bikeway on Terry Francois Boulevard to the San Francisco Bay Trail.
Статус проекта (Project Status)
- Completed
Streets
3rd Street
Контактная информация (Contact Information)