Third Street Bridge Bikeway Connection

Giới thiệu Dự án (Project Introduction)

In July 2020, the SFMTA completed a two-way bikeway connection between the Promenade/Berry St. and Terry Francois Blvd. to the south across the Lefty O’Doul (3rd St) Bridge as part of the Third Street Bridge quick-build project. The protected bikeway provides dedicated space for bicyclists and reduce the risk of conflicts with vehicles. The Third Street Bridge Bikeway Connection closes a critical gap in our bike network by connecting the existing protected two-way bikeway on Terry Francois Boulevard to the San Francisco Bay Trail.

Vision Zero SF logo
Tình Trạng Dự Án (Project Status)
  1. Completed
Streets
3rd Street
Thông Tin Liên Hệ (Contact Information)