Sunset Tunnel Trackway Improvement Project

프로젝트 소개 (Project Introduction)

The project aimed to improve the safety and reliability of the N Judah Line by replacing track and other infrastructure inside the Sunset Tunnel. Other improvements included Transit Signal Priority upgrades at nine intersections along the N Judah Line and construction of accessible platforms at Judah and 28th Avenue.

프로젝트 상태 (Project Status)
  1. Completed
현 단계 또는 국면 (Current Phase or Stage)
Completed
예상 완료일 (Predicted Completion)
October 2017
Bus Routes and Rail Lines
프로젝트 상세사항, 이력 또는 특징 (Project Details, History or Features)

The Sunset Tunnel Trackway Improvement Project replaced tracks and repaired other infrastructure inside the Sunset Tunnel, which is located between Cole Valley and Duboce Triangle. The project also brought the following improvements to the tunnel and the N Judah Metro line:

  • Rail replacement: New track for a smoother, faster ride on Muni
  • Overhead Contact System (OCS) replacement: An improved overhead wire system to enhance safety and reliability of the N Judah Line
  • Fire safety system upgrades: Refurbishing fire water valves
  • Seismic upgrades: Structural retrofit of the Sunset Tunnel portal retaining walls and their foundations
  • Transit Signal Priority upgrades: Addition of transit signal priority for rail cars at nine intersections
  • Accessible platforms: Construction of two accessible platforms at 28th Avenue to provide safe boardings for all customers

The construction was coordinated with the Transit Signal Priority upgrades that prioritize rail cars at nine intersections: 19th/Judah, Sunset/Judah, Carl/Stanyan, 9th/Irving, 9th/Judah, 6th/Irving, 7th/Irving, 4th/Irving, and 18th/Judah. Construction of two accessible platforms at 28th Avenue also took place.

연락처 (Contact Information)