Great Highway Traffic Signal Upgrades

Share this:
導言 (Project Introduction)

The Great Highway Traffic Signal Upgrade project will replace traffic signal hardware at 8 intersections along the Great Highway between Lincoln Way and Vicente Street.  These signals are prone to corrosion and failure due to their proximity to the ocean and wind, water, and sun exposure. This project will replace all existing signal infrastructure including poles, signal heads, subsurface conduits, and controllers. The project will also install new accessible (audible) pedestrian-activated signals to improve safety for vision-impaired pedestrians.

The project was made possible in part by Proposition K Sales Tax dollars provided by the San Francisco County Transportation Authority, General Fund Population Growth Proposition B, and other local funds.


Project Locations

  • Great Highway & Lincoln Way
  • Great Highway & Judah Street
  • Great Highway & Lawton Street
  • Great Highway & Noriega Street
  • Great Highway & Pacheco Street
  • Great Highway & Rivera Street
  • Great Highway & Taraval Street
  • Great Highway & Vicente Street
項目時間表 (Project Timeline)
Design
Summer 2020 - Fall 2024
Pending
Solicit Bids from Contractors
Fall 2024 - Spring 2025
Pending
Construction
Spring 2025 - Summer 2026
Pending
項目狀態 (Project Status)
  1. 精巧設計 (Detailed Design)
改善 (Improvements)
SFMTA Drive and Parking icon
walking
SFMTA Accessibility icon
街坊 (Neighborhoods)
San Francisco County Transportation Authority logo
San Francisco Public Works logo
Vision Zero SF logo
聯繫資料 (Contact Information)
Jarrett Hornbostel