FINAL UPDATE: Delay at West Portal has cleared. Incident #LTaraval train was removed from service. OB #subwaysvc is resuming.
Muni Alerts
ATTN: OB #subwaysvc delayed at West Portal due to a train mechanical issue.
UPDATE: Emergency repair work has been completed. IB/OB #subwaysvc resuming normal operations. Maintenance crew will continue to monitor and observe the track switch.
FINAL UPDATE: Delay at Bridgeview and Topeka is clearing. IB/OB 54 resuming regular service.
ATTN: IB/OB 54 delayed near Bridgeview and Topeka as two coaches are unable to pass one another. IB/OB 54 will reroute via Williams.
UPDATE: #subwaysvc is slow moving in both directions btwn Van Ness and Embarcadero at this time.
UPDATE: @SFBART is providing mutual assistance at this time. Please see the BART station agent.
UPDATE: Due to the ongoing track switch issue, our maintenance crew will need to make the emergency repairs before the end of revenue #subwaysvc. To minimize service impacts, OB trains will operate through the affected area but at a reduced speed as personnel will be on scene. We expect that there will be intermittent OB #subwaysvc holds while the repair work takes place. As a reminder, consider alternate bus svc or delay using the subway, if possible, until after the repair work is completed. https://sfmta.com/getting-around/muni/routes-stops/muni-metro-alternatives
UPDATE: Delay near Duboce Portal is clearing. OB #subwaysvc resuming. Expect residual IB/OB service delays.
UPDATE: OB #subwaysvc delayed near Duboce Portal due to track switch issue. Maintenance crew working to address. Expect OB trains to remain at station platforms until clear.
UPDATE: OB #subwaysvc is experiencing slow moving service btwn Van Ness and Church stations. Expect longer dwell times at station platforms btwn Embercadero & Van Ness.
FINAL UPDATE: IB/OB 48 has resumed regular service at 24th & Noe.
UPDATE: It has been determined that the repair work may take longer than the anticipated 20 mins, as a result our subway maintenance crew will wait until revenue #subwaysvc has ended to make those repairs. The subway will conduct normal svc operations.
UPDATE: Our subway maintenance team is preparing to conduct emergency repairs on the track switch in the next 15 mins. We anticpate an OB #subwaysvc delay of approx. 20 mins. Select IB trains maybe switchback on the surface to help alleviate any possible congestion issues. During the repair work please consider using alternate bus service for OB travel or, if possible, wait until after the emergency repair work has been completed to use OB #subwaysvc. https://sfmta.com/getting-around/muni/routes-stops/muni-metro-alternatives
ATTN: IB/OB 48 delayed at 24th & Noe by Muni-involved collision. Expect delays and reroute.
UPDATE: Track switch issue is resolved. We are working to reduce downtown traffic in both directions. Expect slow-moving service between Van Ness & Embarcadero in both directions until service has balanced out.
FINAL UPDATE: Delay at Baker Beach has cleared. IB/OB 29 resuming regular service.
FINAL UPDATE: Delay at Ferry Portal is clearing. OB #NJudah resuming service into the tunnel. IB #subwaysvc remains slow moving btwn VN and Embarcadero.
ATTN: IB/OB 29 blocked at Beach Beach terminal by a non-Muni collision. IB 29 will switch back at California.