Muni Metro East Storage Site Improvements

Share this:
프로젝트 소개 (Project Introduction)

The back lot of the Muni Metro East (MME) Rail Facility has been used as an SFMTA storage yard since it opened. Adjacent to the MME rail yard, the back lot has stored a variety of equipment and bulky materials, including rail tracks, poles for the OCS wires that power Muni trains and trolley buses, and other miscellaneous transit items. The site will undergo minor upgrades so that electric trolley buses can also be stored there. To keep stored vehicles in a state of good repair, bus batteries would be charged on-site to prevent deterioration from non-use. Buses would enter and exit the site from Maryland Street.  


Overhead map view of the Muni Metro East Yard outlined by a green border with the words "Metro East Division AKA MME burned on top, adjacent to the back storage lot surrounded by a red border with the words MME Back f

Project Timeline
Summer 2024
Planning and Design
Pending
2024 to 2025
Site Improvements
Pending
현 단계 또는 국면 (Current Phase or Stage)
Planning
예상 완료일 (Predicted Completion)
Spring 2025
개선 (Improvements)
bus
Spot filling uneven ground at the existing gravel parking area with gravel and crushed concrete
Streetscape
Replacing security fencing
Streetscape
Improving and increasing yard lighting
Streetscape
Clearing weeds and trash

Improvements to the Muni Metro East Storage Site do not include trenching or digging at the site.  

연락처 (Contact Information)
Caroline Cabral, Public Information Officer