Please see Related Projects on this page for current project information. See Travel & Transit Updates for current travel updates. We are keeping this page as a record of SFMTA service and outreach.

L Taraval Improvement Project Work Forecast August 22 - September 4, 2020

Share this:
Neighborhoods Affected

Work Forecast Plan for the Weeks of August 22 to September 4, 2020

Details of Work Performed:
  • Water main connection is planned for Tuesday, August 25 between 42nd and 40th Avenue (southside) at 10:00 p.m.
  • Lower Great Highway between Taraval and Santiago Street will be closed from 9 a.m. to 3 p.m. on Tuesday, August 25 for material delivery. This work should last for approximately one to two hours.
  • Sewer main connection crossing work is planned for the weeks of:
    • August 25 between 45th and 44th Avenue (southside)
    • August 22 and August 24-28 between 46th and 45th Avenue (southside)
    • August 22 and August 24-26 between 43rd and 42nd Avenue (southside)
    • August 31-September 4 between 42nd and 41st Avenue (southside)
    • Starting September 2 between 41st and 40th Avenue (southside)
    • Starting September 4 between 40th and 39th Avenue (southside)
  • Continuation of waterline work is planned for:
    • August 24 between 46th and 45th Avenue (southside)
    • August 31-September 4 between 45th and 43rd Avenue (southside)
    • August 22 and 24-28 between 39th and 38th Avenue (southside)
    • August 22 and 24-28 between 37th Avenue and Sunset Boulevard (southside)
  • Continuation of sidewalk curb ramp work is planned for:
    • August 24-25 between 40th and 39th Avenue (southside)
    • August 26-28 and August 31-September 4 between 43rd and 42nd Avenue (southside)
    • August 24-25 between 42nd and 41st Avenue (southside)
    • August 26-28 and August 31-September 4 between 41st and 40th Avenue (southside)
    • August 24-25 between 39th and 38th Avenue (southside)
  • Construction of replacement Muni overhead contact system (OCS) pole's foundation is planned of: 
    • Starting September 3 between 39th and 38th Avenue (northside)
    • August 31-September 2 between 38th Avenue and Sunset Boulevard (northside)
    • September 1-2 between 39th and 38th Avenue (southside)
    • August 31-September 4 between 37th and 36th Avenue (southside)
  • Removal of existing Muni overhead contact system (OCS) is planned for:
    • August 27-28 at 46th Avenue and Vicente Street
    • August 31-September 2 at 47th Avenue and Vicente Street
    • Starting September 3 at 46th Avenue and Wawona Street
  • Transfer of existing overhead wires to temporary wooden poles is planned for:
    • August 24 at 46th Avenue & Vicente Street and 47th Avenue & Wawona Street
  • Replacement of existing guy span wires is planned for:
    • August 24-26 on 46th Avenue between Taraval and Wawona Street 
    • August 24-26 on 47th Avenue between Vicente and Wawona Street 
    • August 24-26 on Vicente and Wawona Street between 46th and 47th Avenue
What to Expect:

Excavation requires jackhammering of the pavement. Dust control measures will be in place to prevent dust kick up from the work.

Heavy vibrations from the shoring and sheet piling work is expected for open trench work.

Water main connection between 42nd and 40th Avenue (southside) will require temporary interruption to service on Tuesday, August 25 starting at 10:00 p.m.

Location and Time of Work:
  • Northside of Taraval Street between 39th Avenue and Sunset Boulevard
  • Southside of Taraval Street between 46th Avenue and Sunset Boulevard
  • Both sides of 46th Avenue between Taraval and Wawona Street, 47th Avenue between Vicente and Wawona Street, and on both Vicente and Wawona Street between 46th and 47th Avenue
  • Monday to Friday 8:00 a.m to 5:00 p.m.; Saturday to Sunday 8:00 a.m to 5:00 p.m.
Traffic Impacts:

Some parking will be temporarily restricted in construction zones and traffic lanes will be modified during active work. 

Lower Great Highway between Taraval and Santiago Street will be closed from 9 a.m. to 3 p.m. on Tuesday, August 25 for material delivery. This should last for approximately one to two hours. Parking will be temporarily restricted during work hours but will be returned at the end of each work day. 

Muni Impacts: Starting Saturday, August 22, the L Construction Bus will substitute the LK Taraval-Ingleside between SF Zoo and Sunset Boulevard for approximately seven months, until Spring 2021, while the construction crew performs track replacement work. Please visit SFMTA.com/LTaravalProject for more details.


The following two-week construction forecast is subject to change due to weather delays or unexpected field conditions.

Questions or concerns? Contact us at LTaravalProject@SFMTA.com or 415.646.2382

Stay Up To Date: For L Taraval Improvement Project work forecast and updates, please sign-up for email updates by visiting LTaravalProject/SFMTA.com.

Map of L Construction Bus service route and transfer points

 


☎ 311 (Outside SF 415.701.2311; TTY 415.701.2323) Free language assistance / 免費語言協助 / Ayuda gratis con el idioma / Бесплатная помощь переводчиков / Trợ giúp Thông dịch Miễn phí / Assistance linguistique gratuite / 無料の言語支援 / 무료 언어 지원 / Libreng tulong para sa wikang Filipino / การช่วยเหลือทางด้านภาษาโดยไม่เสียค่าใช้จ่าย / خط المساعدة المجاني على الرقم