Muni Alerts

1 year 2 month ago

FINAL UPDATE: Delay at Ocean and 280 has cleared. IB/OB #KIngleside resuming service.

1 year 2 month ago

ATTN: IB/OB #KIngleside delayed at Ocean and 280 by a stalled train.

1 year 2 month ago

ATTN: IB #MOceanView is blocked near Randolph and Arch by #SFPD. Expect delays and possible switchback.

1 year 2 month ago

FINAL UPDATE: Delay at 16th and Church has cleared. OB 22 resuming regular service.

1 year 2 month ago

FINAL UPDATE: Delay on Leavenworth has cleared. IB 27 resuming regular service.

1 year 2 month ago

ATTN: IB 27 blocked on Leavenworth btwn Turk and Golden Gate by #SFPD.
➡️IB 27 routing via McAllister to Larkin to Eddy to Leavenworth

1 year 2 month ago

ATTN: OB 22 blocked at 16th and Church by #SFPD.
➡️OB 22 routing via Church to 17th to Dolores to 16th

1 year 2 month ago

FINAL UPDATE: Mechanical issue resolved. Eastbound #SubwaySvc has resumed.

1 year 2 month ago

ATTN: Eastbound #SubwaySvc delay at Powell due to train mechanical issue.

Working to clear. Will update.

1 year 2 month ago

FINAL UPDATE: Non-Muni collision cleared. IB/OB 44 O'Shaughnessy is resuming regular route.

1 year 2 month ago

ATTN: IB/OB 44 O'Shaughnessy rerouting around Cabrillo/7th due to non-Muni collision.

IB via 8th-Balboa-6th to reg. route.
OB via Cabrillo-7th-Fulton-8th to reg. route.

IB/OB stop @ Cabrillo/7th missed.

1 year 2 month ago

ATTN: IB/OB #NJudah delayed at Judah and 48th due to a stalled train.
➡️OB N trains will switch back at Sunset
➡️Bus shuttles, once in place, will provide svc btwn Sunset and La Playa

1 year 2 month ago

FINAL UPDATE: Delay on Treasure Island has been cleared. IB/OB 25 will be resuming service. Expect longer IB/OB wait times until svc normalizes.

1 year 2 month ago

UPDATE: #SFMuni field personnel is on scene working to get the coaches off Treasure Island. However, until the road is clear for service to resume, coaches (once off the island) will remain at the Transit Center.

1 year 2 month ago

UPDATE CORRECTION: Both coaches remain blocked on Treasure Island. We apologize for the confusion which was due to a miscommunication.

1 year 2 month ago

FINAL UPDATE: Delay on Treasure Island has cleared. The 25 is resuming service. Expect extended wait times in both directions.

1 year 2 month ago

ATTN: Currently both coaches on the 25 are blocked on Treasure Island by utility vehicles. We'll work to get the coaches back in service as quickly as possible.

1 year 2 month ago

ATTN: IB/OB 22 may experience delays and possible reroute due to #SFFD activity near Fillmore and Filbert.

1 year 2 month ago

FINAL UPDATE: Safety check has concluded. IB/OB #subwaysvc resuming normal operation.

1 year 2 month ago

ATTN: Report of an intruder near Embarcadero Station. IB/OB #subwaysvc will experience slow moving service as we conduct a safety check.