ATTN: IB #JChurch delayed at Church/Valley due to non-Muni collision.
IB J will switchback at Church/30th.
Bus shuttles being arranged to support svc in both directions.
ATTN: IB #JChurch delayed at Church/Valley due to non-Muni collision.
IB J will switchback at Church/30th.
Bus shuttles being arranged to support svc in both directions.
FINAL UPDATE: Police activity has cleared. The 28 19th Ave. has resumed regular routing.
ATTN: The 28 19th Ave Route will reroute around the Golden Gate Bridge toll plaza area due to police activity.
The two stops at the bridge parking lot area will be missed until further notice.
UPDATE: The 18 46th Ave. Route will now have 3 buses (down from the scheduled 5).
One is awaiting the mobile cleaning crew for a spill on board.
Another is out of service w/ a mechanical issue.
Route is being adjusted to 30 min. headways (up from scheduled 20).
HeadsUp: Expect longer wait times on the 18 46th Ave. Route due to service being temporarily limited to two buses.
FINAL UPDATE: Delay at Fillmore and Bush is clearing. OB 22 resuming regular service.
UPDATE: OB 22 will reroute via Bush to Buchanan to Sutter to Fillmore.
FINAL UPDATE: Delay at 4th and Berry is clearing. NB #TThird resuming service.
ATTN: NB #TThird delayed at 4th and Berry due to #SFPD.
UPDATE: OB 22 will reroute via Bush to Webster to Sutter back to Fillmore. No stops will be missed.
ATTN: OB 22 blocked at Fillmore and Bush by #SFFD activity.
FINAL UPDATE: Powell Cable Car Line is back up and running. IB/OB Hyde and Mason lines resuming regular service.
ATTN: The Powell Cable Car Line is currently down due to a cable issue. Expect IB Hyde and Mason cable cars to switch back at Washington and Powell.
ATTN: Due to the earlier delay IB #subwaysvc is experiencing heavy train congestion btwn Forest Hill and Castro.
FINAL UPDATE: Delay at Forest Hill is clearing. A #KIngleside train has been removed from service. IB #subwaysvc is resuming. Expect residual delays.
ATTN: IB/OB #subwaysvc delayed at Forest Hill due to an obstruction on the tracks. We are working to clear.
FINAL UPDATE: System issue has been resolved. IB/OB #subwaysvc resuming normal operation. Expect residual delays.
ATTN: IB/OB #subwaysvc will be slow moving btwn Van Ness and Embarcadero due to a system issue. Signal maintenance personnel is on scene.
FINAL UPDATE: Delay at Civic Center has cleared. IB #subwaysvc is resuming.
ATTN: IB #subwaysvc delayed at Civic Center due to a train door issue. We are working to clear.