L Taraval Improvement Project

Segment B Update – July 1 - 13, 2024

The L Taraval Improvement Project is on track to be completed this fall. The most disruptive work to replace sewer, water, rail lines, streetbase and repaving the entire corridor has been completed.

We are completing installation of boarding islands with rails and tiles, and adding landscaping, artwork and safety features such as high-visibility crosswalks.


L train testing

Train Testing

The Overhead Contact System (OCS) lines have been energized for the initial testing of trains. Workers are in the area testing ground conduits and infrastructure to accommodate trains. If you are driving or working in the area, please stay alert around trains and crews during testing.

To ensure the safety of the public, a permit is required for any contractors that are planning to work within 10 feet of the overhead wires. Please reach out to the project team with any questions: LTaravalProject@SFMTA.com or 415.646.2379

General construction hours are Monday to Friday between 8:00 a.m. and 4:00 p.m. Construction schedules are subject to change. “No Parking” signs will be posted in construction and staging areas.

Construction work is scheduled to be performed – July 1 - 13, 2024

No construction is scheduled for the 4th of July holiday

Train Testing (anticipated)

Testing is planned to be performed between 6 a.m. to 2 p.m.

6/25/24 to 7/1/24: Mock test train for OCS adjustments

7/15/24 to 7/19/24: Operational LRV train testing  

  • 15th Ave between Taraval and Ulloa streets: Intermittent parking removal on both sides of the street during train testing
  • Ulloa between Forest Side and Lenox streets: Intermittent parking removal on both sides of the street during train testing

L Taraval Striping

Striping

Taraval Street

  • 15th Avenue: Preparation for planting, tree and stump removal
  • 17th, 18th, 19th, 21st, 28th, 30th avenues: prepare and paint railings Install thermos crosswalk, crosswalk striping, install art panels
  • 21st to 22nd; 22nd to 24th; 35th to 36th avenues: Boarding island pavers

Ulloa

  • Forest side to 15th Avenue: Preparation for planting, tree removal

Night work from 10 p.m. to 5 a.m., Sundays through Fridays

  • Ulloa Street between 15th and Forest Side avenues and Taraval between 15th to 36th avenues: Upgrade the Overhead Contact System (OCS). Prepare and paint existing OCS poles. Work is expected to be completed July 15, 2024.

Temporary staging locations

  • No active temporary staging locations

Present – Fall 2024

L Taraval / L Special / L Owl - Inbound

  • Taraval Street and 15th Avenue has been relocated to the southeast side of the intersection until fall 2024.         

Multiple city agencies are performing infrastructure work in the area, including Public Works on 19th Avenue, Public Utilities Commission at Vicente and Wawona streets and PG&E along Taraval Street.

Learn more about the L Taraval Improvement Project at our website.