Muni Alerts

3 months 3 weeks ago

UPDATE: It has been determined that the repair work may take longer than the anticipated 20 mins, as a result our subway maintenance crew will wait until revenue #subwaysvc has ended to make those repairs. The subway will conduct normal svc operations.

3 months 3 weeks ago

UPDATE: Our subway maintenance team is preparing to conduct emergency repairs on the track switch in the next 15 mins. We anticpate an OB #subwaysvc delay of approx. 20 mins. Select IB trains maybe switchback on the surface to help alleviate any possible congestion issues. During the repair work please consider using alternate bus service for OB travel or, if possible, wait until after the emergency repair work has been completed to use OB #subwaysvc. https://sfmta.com/getting-around/muni/routes-stops/muni-metro-alternatives

3 months 3 weeks ago

ATTN: IB/OB 48 delayed at 24th & Noe by Muni-involved collision. Expect delays and reroute.

3 months 3 weeks ago

UPDATE: Track switch issue is resolved. We are working to reduce downtown traffic in both directions. Expect slow-moving service between Van Ness & Embarcadero in both directions until service has balanced out.

3 months 3 weeks ago
ATTN: Slow-moving Westbound #SubwaySvc due to track switch issue between Van Ness & Church stations.
 
Crews are working to repair the switch.
Will update.
3 months 3 weeks ago

FINAL UPDATE: Delay at Baker Beach has cleared. IB/OB 29 resuming regular service.

3 months 3 weeks ago

FINAL UPDATE: Delay at Ferry Portal is clearing. OB #NJudah resuming service into the tunnel. IB #subwaysvc remains slow moving btwn VN and Embarcadero.

3 months 3 weeks ago

ATTN: IB/OB 29 blocked at Beach Beach terminal by a non-Muni collision. IB 29 will switch back at California.

3 months 3 weeks ago

ATTN: OB #NJudah delayed at Ferry Portal due to a track switch issue. IB #subwaysvc btwn Van Ness and Embarcadero is slow moving.

3 months 3 weeks ago

FINAL UPDATE: Delay at Visitacion and Talbert clear.

3 months 3 weeks ago

ATTN: IB/OB 8 & 9 blocked at Visitacion & Talbert by construction equipment.

3 months 3 weeks ago
FINAL UPDATE: Overhead line has been repaired.
 
IB/OB #NJudah trains are resuming regular service.
3 months 3 weeks ago
ATTN: IB #NJudah delayed at Judah/17th due to possible overhead line issue.
 
Working to confirm. Will update as more information becomes available.
3 months 3 weeks ago

FINAL UPDATE: IB/OB 29 Sunset has resumed regular route.

3 months 3 weeks ago
ATTN: IB/OB 29 Sunset reroute due to SFFD on Persia/Paris.
 
➡️IB via Lisbon-France-London-Persia to reg. rte.
➡️OB via London-France-Lisbon-Persia to reg. rte.
 
🔴Missed Stops (both directions): Persia/Paris
🟢Board (both directions): Persia/Madrid OR Persia/Mission
3 months 3 weeks ago

FINAL UPDATE: Overhead line work completed. OB 1 California is resuming regular route.

3 months 3 weeks ago

ATTN: OB 1 California rerouting around Sacramento/Jones due to overhead line work. Via Sac. - Jones - California - Larkin - Sac. to regular route Stops Missed: Sac./Leavenworth & /Hyde Board: Jones OR Larkin

3 months 3 weeks ago

FINAL UPDATE: Stalled train cleared from Church/16th @ 9:24 AM. IB #JChurch is resuming service. Bus shuttles will remain in place for at least one IB and OB trip to cover any gaps in svc on the line. 

3 months 3 weeks ago
ATTN: IB #JChurch delayed at Church/16th due to a stalled train. Working to clear.
 
Will update.
3 months 3 weeks ago

FINAL UPDATE: Delay at Lyell and Still has cleared. IB 44 & 52 resuming service.