FINAL UPDATE: Delay at Market & 4th has cleared. Incident streetcar was removed from service. OB #FMarket resuming service.
Muni Alerts
FINAL UPDATE: The Powell Cable Car Line is back up and running.
ATTN: Due to a Muni-involved collision, there are currently only two coaches in service on the 25. Expect longer IB/OB wait times.
ATTN: The Powell Cable Car Line is currently down. Expect possible IB Hyde and Mason cable car switchbacks at Washington and Powell.
HeadsUp: Beginning at around 10 a.m., #FMarket service will be limited to bus shuttles along Market St. to the Ferry Building due to overhead line repair work.
(1/2)
FINAL UPDATE: Stalled train has been cleared from 3rd St. #NJudah & #TThird pull-outs are resuming.
Bus shuttles will remain in place on the #NJudah, temporarily, as we work to balance the line.
UPDATE: Bus shuttles are being arranged to help support #NJudah service and minimize any service gaps due to the delay affecting train pull-outs along 3rd St.
ATTN: #NJudah & #TThird service may experience prolonged wait times due to a disabled vehicle blocking pull-outs from the rail yard on 3rd St.
Working to resolve. Will update.
UPDATE: OB 19 will reroute via Eddy to Jones to McAllister to Hyde.
➡️Use stops at Eddy & Larkin or Hyde & Grove
➡️The 31 is not impacted at this time.
ATTN: #SFPD activity on Hyde btwn Golden Gate and Turk. The 19 and 31 may experience delays and possible reroutes.
FINAL UPDATE: Delay at Broad and Plymouth has cleared. OB #MOceanView resuming service.
ATTN: OB #MOceanView blocked at Broad and Plymouth by an automobile on the tracks. Expect OB M trains to switchback at SF State.
FINAL UPDATE: The Hyde and Mason Cable Car lines are back up and running.
ATTN: Powell Hyde and Powell Mason Cable Car lines currently delayed due to a cable check near Washington and Mason.
ATTN: Powell Hyde and Powell Mason Cable Car lines currently delayed due to a cable check near Wahsington and Mason.
FINAL UPDATE: Delay at Church and Market has cleared. IB #JChurch resuming service.
ATTN: IB #JChurch delayed at Church and Market due to a passenger on a 22 bus needing medical attention.
FINAL UPDATE: Third coach is back in service on the 36.
FINAL UPDATE: Delay at the 4th Street Bridge has cleared. NB/SB #TThird resuming regular service.
ATTN: NB/SB #TThird delayed at 4th Street Bridge due to a power/signal issue.