ATTN: IB 24 blocked near 30th and Noe by #SFPD activity.
Muni Alerts
FINAL UPDATE: Delay at 25th and Mississippi has cleared. IB/OB 48 resuming regular service.
FINAL UPDATE: Delay at Church and 24th has cleared. OB #JChurch resuming regular service.
ATTN: IB/OB 48 delayed near 25th and Mississippi by a stalled coach. IB/OB 48 will reroute via Cesar Chavez btwn Connecticut and Pennsylvania.
FINAL UPDATE: Delay at Montgomery Station has cleared. IB #subwaysvc is resuming.
ATTN: IB #subwaysvc delayed at Montgomery due to a train door issue.
ATTN: OB #JChurch delayed at Church and 24th due to a patron on board a train needing medical assistance.
ATTN: Powell Mason Cable Car Line will be down for the remainder of the night due to a cable issue.
FINAL UPDATE: Safety check at Civic Center has concluded. #Subwaysvc resuming normal operation in both directions.
ATTN: We are conducting a safety check at Civic Center due to a report of an individual on the trackway. Expect slow moving service in both directions btwn Van Ness and Powell.
FINAL UPDATE: IB/OB 28 resuming regular service near Golden Gate Bridge.
UPDATE: Only the IB Mason Line is affected. The collision is on Mason at Washington. IB Hyde Line is operating normally through the area.
FINAL UPDATE: The California Cable Car Line is back up and running.
ATTN: IB Hyde and Mason Cable Car lines blocked near Washington and Mason by a non-Muni collision.
ATTN: The California Cable Car Line is currently down due to a cable issue.
ATTN: California Cable Car Line is delayed due to a cable strand alarm. Crews inspecting cable for potential damage.
Will update as more information becomes available.
ATTN: IB/OB 28 19th Ave. Route rerouting due to protest activity on the Golden Gate Bridge.
28 buses will skip the GG Bridge stops in both directions until further notice.
FINAL UPDATE: IB/OB #TThird cleared at 3rd & McKinnon. Regular service resuming. Expect residual delays.
ATTN: IB/OB #TThird delayed at 3rd & McKinnon due to a non-Muni collision. Will update.
FINAL UPDATE: The 5, 6, 7, 9 cleared & resuming regular service. Expect residual delays.