UPDATE (November 2024) -
The Howard Streetscape Project -
- The project is currently in the detailed design phase and just reached a 95% design milestone in October 2024. Community engagement is happening to share an update on public realm enhancements and get input on loading needs
- Thank you for joining us at our open house this past Saturday, November 16, 2024. Please check out the Open House Materials and fill out our survey, available through December 13, 2024.
Located in the South of Market neighborhood (SoMa), between 11th Street and 4th Street, Howard Street is a two to three -lane westbound arterial originally built to support manufacturing and warehousing.
Over the past two decades, this project area has experienced explosive growth in housing and office employment. This growth coupled with a large population of disadvantaged communities significantly increased the number of people walking and bicycling.
Project Goals
- Improve safety for all users
- Make biking, walking and riding transit in SoMa more comfortable
- Identify/reflect the cultural diversity and vibrancy in SoMa
- Enhance the public realm and landscape
The Project addresses safety issues on Howard Street, a corridor on San Francisco’s Vision Zero High Injury Network (i.e., the 12 percent of San Francisco streets with 68 percent of severe and fatal traffic collisions). Between 2019 and 2023, one fatality occurred on the corridor along with 107 traffic crashes on Howard Street, with more than half of these involving people walking or biking.
Project Components
Once completed, Howard Street will implement the following treatments:
Roadway Configuration Changes
- Removal of one westbound travel lane on Howard Street between 4th Street and 11th Street
Pedestrian Safety Improvements
- New corner bulb-outs that shorten crossing distances
- Traffic signals with optimized signal timing
- Raised bikeway crossings that will prioritize pedestrians
- Leading Pedestrian Intervals or pedestrian head starts
- Raised crosswalks at alleyways for step free access
Bicycle Safety Improvements
- New two-way protected bike lane on Howard from 4th Street to 11th Street
- Concrete buffers and parking bays to separate moving vehicles and people biking
- New bicycle and turning signals with dedicated phases for cyclists and turning vehicles
- Raised bikeways at select alley crossings to prioritize a cyclist’s right-of-way
Loading and Parking Improvements
- ADA compliant passenger loading zones to accommodate wheelchair ramp deployment
Public Realm Improvements
- Commemorative plaques, benches, decorative crosswalks, cultural signs, landscaping and trees
- New pedestrian street lighting
Utility Upgrades
- Upgraded auxiliary water supply system
- Improved drainage and sewer system
Immediate Need to Address Safety
Beginning in 2019, the SFMTA completed “Quick-Build” improvements on Howard Street from 11th Street to 3rd Street with a Class IV parking- protected bicycle lane and Howard Street between 3rd Street and The Embarcadero using effective temporary and adjustable measures such as paint, traffic delineators, and signage.
- Upgrading the existing bike lane to a parking-protected bikeway in the westbound direction to provide a more comfortable and separated space for people riding bikes
- Daylighting at intersections and driveways to improve intersection visibility
- Increasing the number of yellow zones to improve loading for commercial businesses
- Reducing the number of traffic lanes to redistribute roadway space for all road users
- Detailed Design