ATTN: IB 29 19th Ave. rerouting from 19th via Vicente-18th-Quintara back to 19th due to non-Muni collision @ Rivera https://t.co/I1gGGgQVGZ
Muni Alerts
FINAL UPDATE: Delay at Embarcadero and Brannan is clearing. Incident train was removed from service. IB #NJudah and https://t.co/GQeIIQm15P
ATTN: IB #TThird and #NJudah delayed at Embarcadero and Brannan due to a stalled train. Maintenance personnel en route.
FINAL UPDATE: IB #FMarket resuming service through Market and 4th. https://t.co/H3IdVL4bqC
HeadsUp: Tonight's #LTaraval Segment B Open House #2 will now be a virtual session which will feature an online pre https://t.co/PfPkpKOIUk
ATTN: The following routes may see extended wait times this afternoon/evening in both directions: 7, 8, 9, 35, 36, 38, 43, 49, and 55.
FINAL UPDATE: Delay at Sunnydale and Bayshore has cleared. IB #TThird resuming regular service. https://t.co/dkvzNEhykd
ATTN: Due to a signal issue at Sunnydale and Bayshore the IB #TThird may switch back at Visitacion.
FINAL UPDATE: Delay at 19th and Lincoln has cleared. Northbound 28 and 29 resuming regular service. https://t.co/nFvzrmy47T
UPDATE: Expect northbound coaches to reroute via Transverse Drive to Crossover Drive back to regular routes. No sto https://t.co/oaEACcL8f9
UPDATE: Northbound 28 and 29 blocked at 19th and Lincoln. Southbound coaches are unaffected. https://t.co/nFvzrmy47T
ATTN: Report of a non-Muni collision near the area of Crossover Drive/19th & Lincoln. Expect delays and possible reroutes for the 28 and 29.
ATTN: The following routes may experience extended wait times this evening: 24, 29, 33, 43, 49, 55, and 57. Each of https://t.co/pmCglZ8vUY
FINAL UPDATE: Incident train has exited the subway. Westbound #SubwayService has resumed with minor congestion down https://t.co/YCAbAm1AvO
UPDATE: Problem train has been removed from service and is being moved out of the subway. Slow moving service is li https://t.co/NkPt1QOVuE
UPDATE: Bus shuttles being arranged to support #SubwayService. Coaches will run in both directions btwn Church/Dubo https://t.co/whfzHZqHIt
ATTN: OB #SubwayService delay at Civic Center station due to train mechanical issue. Working to resolve. Will update.
FINAL UPDATE: California Cable Car Line resumed normal operations at the start of service this morning (1/3/2022). https://t.co/CWwcEtmW8y
FINAL UPDATE: OB #SubwaySvc cleared at West Portal Station. Regular service resuming. Expect residual delays. https://t.co/FhXT4SyWNr