762 Fulton Street, San Francisco, CA, United States
The SFMTA proposes a pilot project along the 5 Fulton corridor that will introduce limited-stop service to provide quicker trips and will increase frequency to reduce crowding between 6th Avenue and Downtown. The target implementation date is fall 2013. Benefits include:
- Improved service reliability and up to 20% quicker travel times
- Reduced crowding with 20-30% more capacity during peak periods
- Improved transit and pedestrian safety
Please join us to discuss this proposed method of improving service within the 5 Fulton corridor.
Referenced Materials
Division, Dep't or Unit